Å·ÃÀ¿Ú±¬ÊÓƵ

Skip to main content

Consultant Procedures and Design Guidelines

Consultant Procedures and Design Guidelines

Å·ÃÀ¿Ú±¬ÊÓƵ of Missouri's Consultant Procedures and Design Guidelines Manual is intended to assist architects, engineers, design professionals, and Design/Build contractors (A/E) in understanding the Å·ÃÀ¿Ú±¬ÊÓƵ's policies, the minimum design and submittal criteria, and the basic minimum requirements for material and products to be included in all Å·ÃÀ¿Ú±¬ÊÓƵ projects.

  • The Å·ÃÀ¿Ú±¬ÊÓƵ of Missouri Consultant Procedures and Design Guidelines are controlled from this site, unless noted.
  • The appropriate edition of the Consultant Procedures and Design Guidelines for Consultants with active UM design projects is referenced in the agreement between the Å·ÃÀ¿Ú±¬ÊÓƵ and the Consultant.
  • Consultants are responsible for downloading the standards from this site.

The manual has the following sections:

Section 1 - Orientation

Section 1, Orientation, describes the general business relationship between the consultant and Å·ÃÀ¿Ú±¬ÊÓƵ.

 

Section 2 - Planning and Contract Development Guidelines

Section 2, Planning and Contract Development Guidelines, list Å·ÃÀ¿Ú±¬ÊÓƵ Codes, standards, design review submittal requirements, drawing, and project manual requirements.

 

Section 3 - Design Guidelines

Click on a Division title to expand the selection and uncover additional information.

Section 3, Design Guidelines

Division Guidelines

Appendices for UM Health Care Facilities

 

Summary of Recent Changes to the Consultant Procedures and Design Guidelines

 

 


 

 

 

 

Reviewed 2025-01-31